Cascade Water Alliance (“Cascade”) invites sealed bids for the public works construction project known as the Bellevue-Issaquah Pipeline (BIP) Relocation at Lewis Creek. This project consists of relocating an approximately 350 linear foot portion of Cascade’s existing 24-inch-diameter, high-pressure ductile iron water transmission main that conflicts with Washington State Department of Transportation (WSDOT) improvements at Lewis Creek near I-90 and SE Newport Way. The Engineer’s Estimate for this project is $2,292,560.00 (Including tax).
An optional pre-bid meeting will be held on Wednesday, December 2, 2026 at 10:00 AM, at the project site, southeastern corner of Lakemont Blvd SE and SE Newport Way (47°33’45.2″N 122°05’53.9″W).
Bids must be received by email at BIPatLewisCreek@cascadewater.org no later than December 16, 2026 @ 9:45AM. All bids will be publicly opened and read aloud via Zoom webinar only: https://us06web.zoom.us/j/88489995339?pwd=PKMOWW9VJvkJbT4jMMrI3CAD8mRIiA.1&from=addon. Passcode: 120222. Bids not received prior to the specified time may be returned without consideration at the discretion of Cascade, which reserves the right to reject any and all Bids, and to waive any informalities or irregularities in any Bid or in the bidding. Each Bid shall be made on the forms include in the Bid package. The Bid(s) and Contract are subject to compliance with prevailing wage standards of RCW Chapter 39.12, and all reporting requirements.
Information regarding DOCUMENT ACCCESS is on the Rosters, RFQs, RFPs, & SEPA page.