2022 Lake Tapps Reservoir Drawdown
Cascade will begin the fall drawdown on November 1 and will bring the reservoir level down from its current approximately 542.5 feet elevation to approximately 538-539 feet elevation for the >>
Second Milfoil Treatment 2022
Cascade conducted milfoil surveys in June and August. Based on these surveys and information received from residents throughout the year, Cascade treated an area July 18 and anticipates treating additional >>
RFQ for On-call Value Analysis/Engineering
Request for Qualifications (RFQ) for On-Call Value Analysis / Value Engineering. RFQ due August 30, 2022 by 2:00 p.m. For more info: Rosters, RFQs, RFPs, & SEPA
2022 Milfoil Treatment Plan
Cascade conducted a milfoil survey in June. Based on this survey and information received from residents throughout the year, Cascade is announcing its 2022 planned milfoil treatment. The areas designated >>
ITB for Plunge Pool Et Al Project
Cascade will be accepting bids for the Powerhouse Plunge Pool Retaining Wall Repair Et Al Project through Tuesday, June 21, 2022 at 2:00 p.m. For more information click here: Rosters, >>