Turf Out Rebate Program

Requirements

  1. The property must be served municipal water by one of the following cities or water districts: City of Bellevue, City of Kirkland, City of Redmond, City of Issaquah, City of Tukwila, Sammamish Plateau Water, Skyway Water & Sewer District.
  2. The project site must be watered by an automatic, in-ground irrigation system.
  3. The turfgrass in the project site must be completely removed and replaced with native or drought-tolerant plants.
  4. The irrigation system must be removed, disconnected, or converted to drip irrigation in the project site area.
  5. A minimum of 100 square feet of turfgrass must be removed for single-family residential projects, and a minimum of 500 square feet of turfgrass must be removed for non-single-family projects (i.e. commercial, parks, houses of worship, multi-family, etc.).
  6. If the approved project is completed per the Turf Out Guide, Cascade will provide a rebate of $1 per square foot of removed turfgrass, up to $500 for single-family residential projects and up to $1,000 for non-single-family projects (i.e. commercial, parks, houses of worship, and multi-family, etc.).

Instructions

  1. Submit your application and attachments.
  2. Wait up to thirty (30) days for confirmation.
  3. Wait until you receive a confirmation letter from Cascade before beginning your project.
  4. Contact Cascade when the project is complete.
  5. Cascade may perform a site inspection prior to issuance of a rebate.

Application

Please be patient as it may take a few minutes to upload your images.

Share: